A machining cost estimate in most job shops lives in an Excel sheet the estimator built over years. Material, set-up, cycle time, finishing and margin go in; a price comes out. The sums are rarely the slow part. The slow part is everything before them: reading the RFQ, studying the drawing, finding the last similar job and typing it all into the sheet.
How the estimate is built
- 01Material
Stock size and grade, from the drawing, at your material price
- 02Set-up
How long the job takes to set, at your rate for that machine
- 03Cycle time
Per part, times the quantity, at the machine rate
- 04Finishing and outside work
Anodising, plating, heat treatment, inspection
- 05Overhead and margin
Your own rules, and the judgement on risk
Where the hours go
Before any of those lines can be filled, someone reads the RFQ email and its thread, opens the drawing, finds the material, the quantity, the finish and the tolerances, and looks for the last time you made something like it. For a shop that receives many RFQs a week, that reading and searching can take more time than the pricing.
What a tool can fill in
The inputs, not the price. A tool can read the RFQ and the drawing’s notes and title block, fill the quantity, material, finish and dates into your own sheet, put the closest past jobs beside it and draft a question for anything the drawing leaves out. The estimator opens a sheet that is ready to price.
Before
Retyping each RFQ into the sheetSearching old folders for a similar partEmailing back for a missing finish
After
- Opening a sheet that is already filled
- The closest past jobs beside the new one
- The question already drafted
What it should not do is set cycle times or prices. Those come from your rates, your machines and your estimator.
We build this as quoting software around the sheet you already use, through our Excel integration. The manufacturing page shows the rest of what we build for machine shops and fabricators.